Published On: July 28 , 2026|

The City Council is investing 1.8 million euros to improve the energy and technological efficiency of the Conference Centre

The investment reinforces the venue’s position as a model of efficient and smart management of business tourism. The projects, funded by the European Next Generation programme, were carried out between 2024 and 2026. These measures help to optimise air conditioning and lighting, integrate renewable energy sources and make progress towards reducing the carbon footprint

Valencia City Council has allocated 1.8 million euros to improve the energy and technological efficiency of the Conference Centre, optimise resource consumption and move towards a more sustainable and innovative management model, with the aim of establishing the venue as an international benchmark for business tourism.

These initiatives form part of the municipal Destination Tourism Sustainability Plan (PSTD, by its Spanish acronym) and have been financed by European Next Generation EU funds, as part of the Spanish Government’s Recovery, Transformation and Resilience Plan. The projects, carried out between 2024 and 2026, have helped to accelerate the modernisation of the site’s energy and technology systems and to improve consumption monitoring, facilities management and decision-making processes.

Paula Llobet, Chair of the Board of Directors of the Valencia Conference Centre and Councillor for Tourism, Innovation and Investment Attraction, has emphasised: “The investments made in recent years have strengthened the venue’s ability to optimise resources, improve decision-making and reduce its environmental impact, thereby establishing an infrastructure that is well-equipped to meet the current and future challenges of the MICE sector.”

“The Next Generation EU funds have provided an opportunity to accelerate a strategic transformation of the Conference Centre and strengthen its competitiveness as one of Europe’s leading conference venues. We have channelled European investment into specific projects that improve energy efficiency, smart building management and the sustainability of our operations,” Llobet pointed out.

Two projects that make a building smarter

The final phase of this transformation was completed in 2026 with the launch of two strategic projects: Metasys and Data Pool, two solutions designed to optimise building management through the intelligent use of technology and data analysis.

Metasys incorporates an advanced energy monitoring and management system that enables real-time monitoring of the building’s energy consumption and optimisation of key aspects such as heating, ventilation and air conditioning, lighting and indoor environmental quality. This tool improves the efficiency of the facilities, enables the integration of renewable energy and helps to further reduce the site’s carbon footprint.

For its part, Data Pool connects the Palace’s main IT systems into a single data platform. This makes it possible to centralise building information, improve its reliability and streamline decision-making, thereby ensuring more efficient resource management.

“Innovation only makes sense when it improves the way we manage our spaces and the experience of those who use them. These measures enable us to plan ahead, optimise resources and continue to offer a venue that is equipped to meet the demands of major international conferences through efficiency, sustainability and innovation,” explained Llobet.

Energy savings and an improved visitor experience

The projects completed this year are in addition to the initiatives launched by the City Council in previous years, thanks to support from European funds. During 2025, the photovoltaic roof system for self-consumption was completed; the interior lighting was fully upgraded with high-efficiency LED technology; the infrastructure for electric mobility was expanded with new charging points; and the first phase of the Digital Twin – a tool designed to optimise the building’s planning and management – was developed.

These initiatives complement the technological innovations that have enhanced the experience for audience members, such as the upgrade of the audiovisual equipment in the three auditoriums, the installation of new large-format screens, and the introduction of state-of-the-art projection and production systems, which enable more advanced audiovisual production.